Introduction
Embarking on a construction or renovation project in Spain can be both exciting and daunting, especially for expatriates unfamiliar with local building regulations. The Spanish Building Code, known as “El Código Técnico de la Edificación” (CTE), governs all construction activities in the country and understands that it is crucial for a successful project.
This guide aims to demystify the Spanish building regulations, focusing particularly on requirements in the East (Valencia, Catalonia, Murcia) and South (Andalusia) of Spain, where many expatriates choose to settle. We’ll walk you through the necessary steps, from initial planning to final certification, with special emphasis on navigating permit processes, meeting energy efficiency standards, and ensuring accessibility compliance.

The Spanish Building Code: An Overview
The CTE (Código Técnico de la Edificación) was established in 2006 and has undergone several updates, with the most significant revisions in 2019 to align with EU energy efficiency directives. The code is structured into two parts:
- Part I: General provisions and conditions for compliance
- Part II: Basic documents (Documentos Básicos or DBs) that establish specific technical requirements

The basic documents are divided into six primary categories:
- DB-SE: Structural Safety
- DB-SI: Fire Safety
- DB-SUA: Safety in Use and Accessibility
- DB-HE: Energy Saving
- DB-HR: Protection Against Noise
- DB-HS: Health, Hygiene and Environmental Protection
Understanding these components is essential as they form the foundation of all building regulations in Spain.

Key Authorities and Regulatory Bodies
Before diving into the specific steps, it’s important to recognize the key authorities involved in the Spanish building regulatory framework:
- Municipal Governments (Ayuntamientos): Issue building permits and conduct initial inspections
- Regional Governments (Comunidades Autónomas): Establish regional variations of the national code
- College of Architects (Colegio de Arquitectos): Reviews and approves architectural plans
- College of Technical Architects (Colegio de Aparejadores): Supervises execution of construction works
- Ministry of Transport, Mobility and Urban Agenda: Oversees the national building code
Step 1: Understanding Property Classification
The first step in any construction or renovation project is understanding how your property is classified, as this determines which regulations apply.
Types of Land Classification:
- Urbano (Urban): Fully developed land with services (water, electricity, sewage)
- Urbanizable (Developable): Land designated for future development
- No Urbanizable (Non-developable): Protected or rural land with strict building limitations
Building Types:
- Vivienda Unifamiliar: Single-family house
- Edificio Plurifamiliar: Multi-family building
- Edificio de Uso Público: Public buildings
- Edificio de Uso Comercial: Commercial buildings
How to Check Your Property’s Classification:
- Request a “Certificado Urbanístico” from your local town hall
- Consult the local “Plan General de Ordenación Urbana” (PGOU) – the urban planning document
- Hire a local architect who can access and interpret these documents
Case Study: The Rural Property Misclassification. An English couple purchased what they believed was a “finca” (rural property) in Valencia that could be renovated. After beginning works without proper permits, they discovered the land was classified as “no urbanizable de especial protección” (non-developable protected land). The project was halted, and they faced substantial fines. This illustrates the importance of verifying land classification before purchase or planning any construction.
Step 2: Navigating Regional Variations (East and South Spain)
While the CTE establishes national standards, regional and local authorities often add specific requirements. Here are key regional variations to be aware of in Eastern and Southern Spain:
Catalonia (East)
- Stricter energy efficiency requirements than the national standard
- Additional technical documentation is known as “Projecte Tècnic”
- Specific fire safety regulations in urban areas
Valencia Region (East)
- “LOTUP” (Ley de Ordenación del Territorio, Urbanismo y Paisaje) governs urban planning
- Coastal construction restrictions (Ley de Costas) affecting properties within 100m of the shoreline
- Water efficiency requirements exceeding national standards
Murcia (East)
- Special earthquake-resistant construction requirements
- Specific regulations for agricultural land conversion
- Water scarcity measures affecting swimming pool construction
Andalusia (South)
- “LOUA” (Ley de Ordenación Urbanística de Andalucía) establishes a regional planning framework
- Historic centre preservation regulations in cities like Seville, Granada, and Córdoba
- Additional requirements for rural tourism accommodations
Pro Tip: Always consult your local town hall (Ayuntamiento) for the most current local regulations. Regional requirements can change, and municipalities may have additional ordinances not reflected in regional or national codes.
Step 3: The Permit Application Process
Navigating the permit process is often the most challenging aspect for expatriates. Here’s a step-by-step breakdown:
- Determining the Type of Permit Needed:
- Licencia de Obra Mayor: For new constructions, structural changes, or significant renovations
- Licencia de Obra Menor: For minor renovations that don’t affect structure (painting, non-structural interior renovations)
- Declaración Responsable: A simplified procedure for certain minor works (increasingly used in many regions)
- Licencia de Primera Ocupación: Required after completion of new buildings before occupation
- Documentation Required for Major Works (Obra Mayor):
- Proyecto Básico: Basic architectural project signed by an architect
- Proyecto de Ejecución: Detailed execution project with technical specifications
- Estudio de Seguridad y Salud: Health and safety study
- Certificado de Eficiencia Energética: Energy efficiency certificate
- Estudio Geotécnico: Geotechnical study (for new constructions)
- Estadística de Edificación y Vivienda: Building and housing statistics form
- Proyecto de Telecomunicaciones: Telecommunications project (for buildings with multiple units)
- Proof of payment of municipal taxes and fees
- Application Process Timeline:
- Architect Preparation: 1-3 months
- College of Architects Review: 2-4 weeks
- Municipal Review: 2-3 months (legally up to 3 months)
- Potential Requests for Clarification: May add 1-2 months
- Total Time: Typically 4-8 months for major works
- Fees and Taxes:
- ICIO (Impuesto sobre Construcciones, Instalaciones y Obras): Construction tax, typically 2-4% of project budget
- Tasa de Licencia: License fee, varies by municipality (0.5-2% of project budget)
- College of Architects fees: Approximately 6-10% of the project budget for full architectural services
- College of Technical Architects fees: Approximately 2-4% of the project budget
Case Study: The Incomplete Documentation Delay A British family attempting to renovate a townhouse in Malaga submitted their permit application with documentation prepared by their architect. However, they failed to include the Energy Efficiency Certificate, resulting in a three-month delay while the municipality requested additional documentation. This illustrates the importance of ensuring all documentation is complete before submission.
Step 4: Energy Efficiency Requirements
Energy efficiency has become increasingly important in Spanish building regulations, with significant updates in 2019 through the DB-HE update. Here’s what expatriates need to know:
- Energy Efficiency Certificate (Certificado de Eficiencia Energética):
- Mandatory for all new constructions and major renovations
- Rates buildings from A (most efficient) to G (least efficient)
- Must be registered with the regional government
- Required for property sales and rentals
- Key Requirements for New Buildings:
- Nearly Zero-Energy Building (NZEB) standards apply to all new buildings
- Minimum contribution from renewable energy sources
- Maximum limitations on energy consumption
- Thermal envelope requirements with maximum U-values for walls, roofs, and windows
- Minimum solar contribution for hot water in most regions
- Requirements for Renovations:
- Major renovations (affecting more than 25% of the thermal envelope) must comply with new building standards
- Even minor renovations must improve energy efficiency if cost-effective
- Window replacements must meet minimum thermal transmittance values
- Regional Energy Requirements in East and South Spain:
- Catalonia: Additional requirements for solar thermal installations
- Valencia: Stricter window efficiency standards in coastal areas
- Andalusia: Solar hot water systems are mandatory for most new buildings and major renovations
- Cost Implications:
- Energy efficiency measures typically add 5-15% to construction costs
- Potential energy savings of 50-70% compared to pre-2006 buildings
- Regional grants and subsidies may be available (consult your local “Agencia de Energía”)
Pro Tip: Consider going beyond minimum requirements for long-term savings. Spain’s climate, particularly in the South and East, makes investments in insulation and solar energy especially cost-effective.
Step 5: Accessibility Standards
Accessibility requirements are governed primarily by the DB-SUA (Safety in Use and Accessibility) section of the CTE, with variations at regional levels. Here’s what expatriates should know:
- Accessibility Requirements for Different Building Types:
- Single-Family Homes: Limited requirements unless public funding is used
- Multi-Family Buildings: Strict requirements for common areas, entrances, and elevators
- Public and Commercial Buildings: Comprehensive accessibility requirements
- Key Technical Requirements:
- Entry and Circulation:
- Minimum door width of 0.80m
- Hallway minimum width of 1.10m
- Ramps with a maximum 10% incline for short runs, 8% for longer runs
- Elevator required for buildings with more than two floors or more than 8 dwellings
- Bathrooms:
- Minimum turning circle of 1.50m diameter in at least one bathroom
- Reinforced walls for potential installation of grab bars
- No step greater than 2cm at shower entrances in accessible units
- Living Spaces:
- Minimum clear turning circle of 1.50m in living room, kitchen, and at least one bedroom
- Power outlets and switches between 0.80m and 1.20m from the floor
- Regional Variations:
- Valencia: Additional requirements for buildings in tourist areas
- Andalusia: Stricter standards for historic building adaptations
- Catalonia: More comprehensive requirements for public spaces
- Renovation Considerations:
- Existing buildings undergoing major renovations must improve accessibility when technically feasible
- “Ajustes Razonables” (Reasonable Adjustments) principle applies, balancing accessibility needs with technical and financial constraints
Case Study: The Historic Building Challenge A German investor renovating a historic building in Seville for tourist apartments faced challenges meeting accessibility requirements while preserving protected historic features. The solution involved working with local heritage authorities (Patrimonio) to develop alternative accessibility measures, including a custom lift system designed to minimize impact on the building’s historic structure. This case demonstrates the importance of early consultation with both accessibility experts and heritage authorities when working with historic properties.
Step 6: Working with Professionals
Successfully navigating Spanish building regulations requires working with qualified professionals. Here’s how to approach this crucial aspect:
- Essential Professionals for Your Project:
- Arquitecto (Architect): Required for all major works and most minor works
- Aparejador/Arquitecto Técnico (Technical Architect): Supervises construction and ensures compliance
- Director de Obra (Works Director): Usually the architect, responsible for project compliance
- Coordinador de Seguridad y Salud (Health and Safety Coordinator): Required for all major works
- Constructor (Builder/Contractor): Executes the construction works
- Finding and Selecting Professionals:
- Look for professionals with experience working with international clients
- Verify registration with respective professional colleges (e.g., Colegio de Arquitectos)
- Request references and examples of similar projects
- Ensure they have professional indemnity insurance
- Consider language capabilities if you’re not fluent in Spanish
- Typical Fee Structures:
- Architects: 6-10% of construction budget for full services
- Technical Architects: 2-4% of construction budget
- Health and Safety Coordination: 1-2% of construction budget
- Construction management: 2-5% of construction budget
- Contracts and Agreements:
- Always use written contracts (even if abbreviated for minor works)
- Ensure contracts specify deliverables, timelines, and payment schedules
- Consider having contracts reviewed by a lawyer familiar with construction law
- Include clauses regarding responsibility for obtaining permits and regulatory compliance
Pro Tip: While it may be tempting to hire professionals offering the lowest fees, experience with expatriate clients and regulatory knowledge is often worth the additional cost. Ask specifically about their experience navigating regulatory challenges with foreign clients.
Step 7: Inspections and Compliance
Once construction begins, various inspections ensure compliance with the approved plans and building regulations:
- Types of Inspections:
- Municipal Inspections: Conducted by the town hall at key project stages
- Technical Inspections: Performed by your technical architect
- Utility Connections: Separate inspections for water, electricity, and gas connections
- Final Inspection: Required for the Certificate of First Occupation
- Certification Process:
- Certificado Final de Obra: Issued jointly by the architect and technical architect
- Licencia de Primera Ocupación/Utilización: Issued by the municipality, permitting occupation
- Certificado de Eficiencia Energética: Final energy certificate based on the completed building
- Escritura de Obra Nueva: Notarial deed registering the new construction
- Registration with the Land Registry: Final step to legally register the construction
- Common Compliance Issues:
- Deviations from approved plans (even minor changes may require approval)
- Technical specifications not meeting minimum standards
- Missing documentation during final certification
- Unauthorized occupation before obtaining the First Occupation License
- Consequences of Non-Compliance:
- Fines ranging from hundreds to tens of thousands of euros
- Demolition orders for serious violations
- Inability to register the property legally
- Difficulties selling or insuring the property
- Inability to connect to utilities legally
Case Study: The Unauthorized Modification. An expatriate family renovating a villa near Alicante decided to enlarge a terrace beyond what was specified in their approved plans, assuming it was a minor change. During the final inspection, this unauthorized modification was discovered, resulting in a €5,000 fine and a three-month delay while they obtained a modification to their original permit. The lesson: even seemingly minor changes require official approval.
Case Studies: Common Challenges for Expatriates
Case Study 1: The Coastal Law Surprise
Location: Costa Blanca, Valencia Region
An English couple purchased a beachfront property with plans to expand the existing structure. After hiring an architect, they discovered their property fell within the protected zone under Spain’s Coastal Law (Ley de Costas), which severely restricted any expansion or substantial modification. The property was in the “servidumbre de protección” zone (100m from the shoreline), where construction is heavily regulated.
Solution: Working with a specialized attorney and their architect, they developed a renovation plan that qualified as maintenance rather than expansion, focusing on interior improvements and energy efficiency upgrades without changing the building’s footprint or volume.
Lesson: Always verify coastal law implications before purchasing a beachfront property. Properties within coastal protection zones often have permanent building restrictions that significantly affect their development potential.
Case Study 2: The Historic Centre Requirements
Location: Granada, Andalusia
A Canadian investor purchased a traditional townhouse in Granada’s historic Albaicín neighborhood, planning to convert it into tourist apartments. The building was designated as having “historic protection level 3,” meaning that while not individually protected, it contributed to the character of the historic district.
Challenges:
- Prohibition on changing the façade
- Requirements to use traditional materials and techniques
- Local ordinances restricting tourist accommodations in certain areas
- Accessibility requirements conflicting with historic preservation needs
Solution: The investor worked with a local architect experienced in historic renovations and engaged early with both the municipal heritage department and tourism authorities. The project was redesigned to preserve historic features while incorporating subtle modern interventions. Additional costs: approximately 30% above initial budget estimates.
Lesson: Historic area renovations require specialized knowledge and early engagement with authorities. Budget for higher costs and longer timelines than standard renovations.
Case Study 3: The Rural Property Conversion
Location: Inland Murcia
An Australian couple purchased a rural property with existing agricultural buildings, intending to convert them into a holiday home with a swimming pool. The property was classified as “suelo no urbanizable” (non-developable land).
Challenges:
- Restrictions on changing the use of agricultural buildings
- Water usage restrictions affecting the swimming pool plan
- Access road requirements not meeting emergency vehicle standards
- Solar/renewable energy requirements for off-grid properties
Solution: The project was reconfigured to qualify under rural tourism regulations rather than as a private dwelling. This required working with the regional tourism authority and re-categorizing the project as a rural tourism establishment, which had different regulatory pathways for approval.
Lesson: Rural properties often have complex regulatory frameworks involving multiple authorities. Converting agricultural buildings or developing rural land often requires creative regulatory approaches and considerable patience.
Glossary of Terms
Understanding the technical terminology used in Spanish building regulations can help expatriates navigate the system more effectively:
- Anteproyecto: Preliminary design
- Catastro: Land registry (tax purposes)
- Cédula de Habitabilidad: Certificate of habitability
- Declaración Responsable: Responsible declaration (simplified permit for minor works)
- Estudio Básico de Seguridad y Salud: Basic health and safety study
- Infracción Urbanística: Urban planning violation
- ITE (Inspección Técnica de Edificios): Technical building inspection
- Licencia de Obra Mayor: Major works license
- Licencia de Obra Menor: Minor works license
- Licencia de Primera Ocupación: First occupation license
- PGOU (Plan General de Ordenación Urbana): General urban planning plan
- Proyecto Básico: Basic project (for initial permit application)
- Proyecto de Ejecución: Execution project (detailed construction plans)
- Registro de la Propiedad: Property registry (legal ownership)
- Suelo Urbano: Urban land
- Suelo Urbanizable: Developable land
- Suelo No Urbanizable: Non-developable land
- Visado: Approval stamp from professional college
Resources and Contact Information
National Resources:
- Código Técnico de la Edificación: www.codigotecnico.org
- Ministerio de Transportes, Movilidad y Agenda Urbana: www.mitma.gob.es
Regional Resources:
Catalonia:
- Collegi d’Arquitectes de Catalunya: www.arquitectes.cat
- Departament de Territori: territori.gencat.cat
Valencia Region:
- Colegio Territorial de Arquitectos de Valencia: www.ctav.es
- Conselleria de Política Territorial: politicaterritorial.gva.es
Murcia:
- Colegio Oficial de Arquitectos de Murcia: www.coamu.es
- Consejería de Fomento e Infraestructuras: www.carm.es/web/pagina?IDCONTENIDO=142
Andalusia:
- Consejería de Fomento, Infraestructuras y Ordenación del Territorio: www.juntadeandalucia.es/organismos/fomentoinfraestructurasyordenaciondelterritorio.html
- Colegio Oficial de Arquitectos de Andalucía Oriental: www.coajaen.org
Expatriate Support Organizations:
- British Chamber of Commerce in Spain: www.britishchamberspain.com
- European Consumers Center Spain: www.cec-msssi.es
Recommended Reading:
- “The Legal Guide to Spain” by Gordon Catts
- “Spanish Property Buying Guide” published by the Overseas Guides Company
- “Código Técnico de la Edificación: Guía para Extranjeros” (available through the Ministry of Housing)
Remember that while this guide provides a comprehensive overview of Spanish building regulations, each project has unique characteristics and challenges. Always consult with qualified local professionals before undertaking any construction or renovation project in Spain.
Thinking about building or renovating in Spain? Make sure your project complies with the Spanish Building Code (CTE) to avoid fines and delays. Consult with an expert architect and start your construction with confidence.
Leave a comment or contact us if you have any questions. We’re here to help!



4 responses
Dear Sir/Madam
I would like to now the (Alvenaria) Brickwork / masonary requirements for New builds in Spain. For instance can you use a thermic brick with lime plastering to exterior and interior ONLY or do regulations require and (ETICS) External Thermal Insulation Composite System ?
Regards
Warren
Hi Warren,
SPANISH CTE THERMAL REQUIREMENTS – OVERVIEW
The Spanish Technical Building Code (CTE), specifically the Basic Document on Energy Savings (DB-HE), establishes mandatory thermal performance requirements for all new construction. New constructions must approach the Nearly Zero Energy Building (nZEB) standard with increased requirements for thermal insulation, air infiltration and transmittance in building envelopes.
THERMAL TRANSMITTANCE REQUIREMENTS
The CTE determines the climatic zone and the maximum thermal transmittance of closures and interior partitions. Buildings must have a thermal envelope that limits their primary energy needs depending on the climatic zone, their use and their compactness. Each element of the thermal envelope must comply with the limit values marked in Table 3.1.1.a – HE1 for new buildings.
CONSTRUCTION METHOD OPTIONS
The critical point: The CTE addresses thermal envelope requirements and energy efficiency standards, but does not mandate specific construction methods. Instead, there are requirements for limiting energy demand (maximum thermal transmittance, condensation control and air permeability).
Thermal Brick with Lime Plastering ONLY:
This method can potentially comply with CTE requirements if:
• The overall thermal transmittance (U-value) of the complete wall assembly meets the climate zone requirements
• Thermal bridges are properly addressed
• Condensation control requirements are satisfied
ETICS (External Thermal Insulation Composite Systems):
ETICS systems are specifically mentioned in Spanish regulations as a method to achieve thermal insulation goals, with energy savings of 30-35% or more in heating and air conditioning consumption. However, ETICS is not mandatory – it’s one option among several.
ALTERNATIVE INSULATION METHODS
The regulations explicitly allow various approaches:
1. Thermal Insulating Lime Plasters: Lime-based insulating plasters made from materials like cork, perlite, or clay can provide significant thermal improvement – 50mm of thermal lime plaster can improve wall thermal performance by approximately 4 times.
2. Performance-Based Compliance: The CTE requires a performance-based reference building calculation (manual or simulation) to show compliance for most building types.
KEY COMPLIANCE FACTORS
What matters is achieving the thermal performance targets, not the specific method used:
• Maximum thermal transmittance values per climate zone
• Overall building energy demand calculations
• Thermal bridge control
• Air permeability requirements
• Condensation control (monthly relative humidity shall be less than 80% on internal walls)
PRACTICAL RECOMMENDATION
Thermal brick with lime plastering alone may NOT be sufficient for most new construction projects to meet current CTE requirements. You would likely need:
1. Thermal calculations to verify U-value compliance
2. Additional insulation measures such as:
o Insulating lime renders/plasters
o Cavity insulation (if using cavity wall construction)
o Enhanced thermal bridge details
3. Professional verification through building energy simulation
Bottom Line: While ETICS is not mandatory, achieving CTE compliance typically requires more thermal performance than standard thermal brick with lime plaster alone can provide. The regulation is performance-based, so any system that meets the thermal transmittance and energy demand requirements will be compliant.
I’d recommend engaging a qualified Spanish building engineer or architect to perform thermal calculations for your specific project and climate zone to determine the most cost-effective compliance strategy.
I hope that this is of help
Juan Pacheco
Architect
Hello, I have been living off grid, on agricultural land for some time. The land is secana. The cabin is a temporary structure. Is there any way to get town water? I’ve been told I need a legal dwelling but is there anything that overrides this eg kids living there?
Regards
Off grid Andalucia
Dear Nicola,
Thank you for your question. It touches on a complex area of Spanish and Andalusian law, and I appreciate you reaching out.
The short answer is that it is highly unlikely you will be able to get a connection to the municipal water supply for a temporary structure on secano (non-irrigated) agricultural land. The presence of children, while a human consideration, does not override the strict legal and urban planning regulations.
I have broken down the key legal issues below to help you understand the situation.
1. The Land Classification and the “Legal Dwelling” Requirement
The core of the issue lies in the classification of your land. In Spain, land is broadly divided into two categories: suelo urbano (urban land) and suelo rústico or no urbanizable (rural/non-developable land). Your land, being agricultural secano, falls into the latter category.
Primary Use: Rural land is intended for agricultural, forestry, or conservation activities.
Construction Restrictions: Permanent houses are generally not permitted on rural plots without explicit planning permission, which is rarely granted.
The “Legal Dwelling” Requirement: Municipalities typically require a property to be a “legal dwelling” (with all the proper planning permissions and licenses) before they will consider connecting it to public services like water and electricity. A temporary structure on secano land would almost certainly not meet this definition.
This is not a simple bureaucratic hurdle; it is a fundamental principle of Spanish urban planning law. As a recent ruling by the Superior Court of Justice of Andalusia (STSJ AND 684/2025) confirmed, a town hall is not obligated to provide basic services (like water and sanitation) to homes on non-developable land, even if they are close to existing networks.
2. The Presence of Children
Your question about children is very understandable. However, Spanish urban planning law is designed to be objective; it applies to the property and its legal status, not to the personal circumstances of the occupants. The court case mentioned above is a clear example of this principle in action. While the welfare of children is a paramount social consideration, it does not create a legal exception that overrides planning regulations.
3. Is There Any Legal Route to a Connection?
The prospects are very limited. The primary legal framework governing water in Andalusia is Law 9/2010, on Waters of Andalusia. Any use of public water resources requires administrative authorisation. For a connection to the municipal supply, you must request permission from the local council (Ayuntamiento).
The council will almost certainly deny this request for the reasons stated above. The recent Andalusian court ruling clarifies that such connections cannot be facilitated through a simple project but would require a complex and costly “Special Plan” (Plan Especial), which is highly unlikely to be approved for a single temporary dwelling.
4. Realistic Alternatives for Water
Given the legal barriers, it is more practical to consider alternative, off-grid water solutions that are common for rural properties in Spain. These include:
Drilling a well: This is a common solution, but it requires a government concession to extract water legally. While shallow wells may sometimes be exempt, deeper wells typically require authorisation and an environmental assessment.
Rainwater harvesting: Collecting rainwater from roofs is another viable option.
Water deliveries: You can arrange for water to be delivered by certified suppliers.
5. Important Cautions
Avoid Illegal Connections: Connecting to the water supply without authorisation is illegal and can lead to significant fines and other penalties.
Check Your Local Plan (PGOU): The specific rules can vary between municipalities. Your first step should always be to consult the Plan General de Ordenación Urbana (PGOU) for your specific town hall to understand the local regulations.
Seek Professional Legal Advice: This is a highly specialized area of law. I strongly recommend you consult with a lawyer (abogado) who specializes in Spanish urban planning and water law. They can review your specific situation and provide definitive guidance.
In summary, while I understand the challenges of off-grid living, the legal framework in Andalusia is very clear. The presence of children does not override the need for your dwelling to be legal before a municipal water connection can be considered. Your most practical path forward lies in exploring legal, self-sufficient water solutions for your property.
Juan Pacheco